| • |
Patented one-piece construction that incorporates a pre-attached closure seal for rapid and consistent field installation procedure |
| • |
Lower pre-heat temperature contributes to lower installation times |
| • |
Fast and efficient field installation in-line with timing requirements of offshore laybarge operations |
| • |
Superior adhesion to a wide range of mainline pipe coatings |
| • |
Consistent performance in rugged offshore environments |
| • |
Compatible with hot mastic pour, polyurethane foam or other infill systems |